Jagdalpur: Chhattisgarh has initiated the process of identifying suitable land for a proposed greenfield airport in the Bastar division, aiming to improve air connectivity with major cities across the country. The district administration has been asked to identify potential sites and submit detailed reports for the proposed project, which is expected to require approximately 979 acres of land.
The initiative has been taken under the directions of the Directorate of Aviation, Nava Raipur. The proposed airport is planned to have a 2,400-metre-long and 45-metre-wide runway. The project is expected to strengthen connectivity and create opportunities for tourism, trade, industry and employment in the region.
AAI to Conduct Technical Survey
The Airports Authority of India (AAI) will conduct a preliminary feasibility study and an Obstacle Limitation Surface (OLS) survey of the locations recommended by the state government. The assessment will examine whether the proposed sites meet aviation safety and technical requirements.
The administration will have to provide details such as village and tehsil, distance from the nearest city, land area, survey numbers, maps and GPS coordinates. Land ownership categories, including government, private, forest and revenue land, will also be verified.
4,400-Metre Assessment Area Required
As per the proposed technical specifications, the airport will require around 396 hectares, equivalent to 979 acres. For safe aircraft operations, the assessment will consider an overall area of approximately 4,400 metres in length and 900 metres in width, including additional clear land around the runway.
Nearby hills, high-rise buildings, mobile towers and high-tension electricity lines will also be examined. Road and rail connectivity, along with electricity and water availability, will form part of the assessment.
Project Still at Preliminary Stage
The proposed airport is expected to improve access to Bastar's tourist destinations, including Chitrakote Falls, Tirathgarh Falls and Kanger Valley National Park. Better air connectivity could also support local businesses and industrial investment.
However, the project is currently at the land-identification and technical-assessment stage. No final site selection or construction approval has been announced. The next steps will depend on the district administration's report and the outcome of the AAI survey.
Hashtags: #ChhattisgarhState #Bhopal #Bastar #Greenfield #Airport #Plan #Search #Begins #979 #BastarGreenfieldAirportPlan

