Topic: Mumbai-Pune Expressway
Six-lane elevated corridor to link Atal Setu with Pune Expressway
MMRDA says about 67 percent of work on the 7.35-km elevated corridor linking Atal Setu with the Mumbai-Pune Expressway has been completed.
November 11, 2026
Mumbai-Pune Expressway 20-Vehicle Crash Caught on Dashcam
Bhopal / Mumbai : A shocking dashcam video has emerged showing the
July 28, 2025
