CNN Central News & Network–ITDC India Epress/ITDC News Bhopal: DRM Pankaj Tyagi carried out a safety and window trailing inspection of the Rani Kamlapati–Harda section. During the window trailing inspection on the Rani Kamlapati–Harda section, the Divisional Railway Manager conducted a detailed review of all safety standards related to train operations, along with a thorough inspection of the track, bridges, OHE (Overhead Equipment), and level crossing gates on the section.
He also reviewed the progress and quality of construction work at the under-construction Harda railway station under the Amrit Bharat Scheme. During the inspection, the ongoing redevelopment works and their quality were closely examined, and instructions were issued to the concerned officials to complete the redevelopment work on time while maintaining high quality standards.

In addition, keeping in view the upcoming non-interlocking work at Harda station, the DRM assessed all safety aspects and reviewed the standards related to yard remodeling works. He also examined the functioning of the Station Master’s panel associated with train operations. The DRM further inspected the basic passenger amenities available at Harda railway station.
During the inspection, the DRM was accompanied by Senior Divisional Operations Manager Rohit Malviya, Senior Divisional Signal & Telecommunication Engineer (Coordination) Dinesh Kumar Kalame, Senior Divisional Engineer (Central & South), and other concerned officials.
#DRMInspection #RaniKamlapatiHarda #WindowTrailing #IndianRailways #RailwaySafety #RailInfrastructure #RailwayOperations

