Topic: Railway Operations

DRM Bhopal Conducts Vande Bharat and Shatabdi Train Inspection

, Bhopal: Divisional Railway Manager (DRM), Bhopal, Pankaj Tyagi

Bhopal SADIPUKA Successfully Maintains 1,148 Coaches in 11 Months

The Passenger Coach Rebuilding Workshop (PCRW), Bhopal of West Central Railway

DRM Conducts Pre Non-Interlocking Inspection at Vyavra Rajgarh Station

DRM Pankaj Tyagi conducted an inspection of the pre non-interlocking work

The Divisional Railway Manager (DRM) conducted a window trailing inspection of the Rani Kamlapati–Harda railway section.

DRM Pankaj Tyagi carried out a safety and window trailing inspection

General Manager of West Central Railway Conducts Review Meeting

A Coordination Review Meeting was held under the chairmanship of Shobhana

Railways Hold Key Meeting on Freight Loading Issues in Bhopal Division

Key Railway Meeting Held in Bhopal Division to Boost Freight Loading