Tag Archive: Bairagarh elevated bridge
Bairagarh elevated bridge must be completed by March 2027: Minister
Public Works Minister Rakesh Singh inspected the Bairagarh elevated bridge with MLA Rameshwar Sharma and directed completion of the project by March 2027.
September 23, 2026
